Round 1, Step 3 High-Priority Project Materials
The Round 1, Step 3 High-Priority Project Application Packet presents the results of the most recent CABY application process. Through this process, CABY staff worked with six project sponsors to develop materials for 10 drought relief and water conservation and efficiency projects (the subject that the Planning Committee deemed high priority in June 2009).
At this point in time, each one of the projects has a few questions or unresolved issues still outstanding. As a result, some work plans include highlighted text; there may be inconsistencies between task listings in the work plans and schedules or budgets; project sponsors may yet decide to make changes in the overall project description or sequencing of tasks; and there are minor inconsistencies in project names between the various sections.
It is important to remember that this version of the application packet is considered a draft version and will undergo at least one more round of comment and revision prior to final ranking and adoption by the PC (in December 2009).
-
INTRODUCTION to the Round 1, Step 3 High-Priority Project Packet
- Expanding the CABY Region Weather Station and Soil Moisture Monitoring Network to Increase Irrigation Efficiency
- Increasing Water Use Efficiency through Irrigation Management Workshops
- Water Use Surveys for the Region's Largest Irrigators
- Washington County Water District Comprehensive Water Conservation Program
- Grizzly Flats Comprehensive Water Conservation Program
- Georgetown Divide Water Conservation Program
- Leak Detection & Repair in the Communities of Alta & Colfax
- Increasing Water Supply Reliability through Fully Metered Bulk Water
- Grizzly Flats Reservoir Lining
- Sunset Industrial Well Upgrade and Expansion